Skip to content
Plug-In Solar Panels
Menu

Plug-in solar in Vermont

In effect since July 1, 2026

Vermont's plug-in solar law is in effect. It allows up to 1,200 W combined per meter, names UL 3700 as the product standard, and is one of the few state laws that speaks directly to renters.

Maximum output
Up to 1,200 W
Combined inverter capacity, one or more devices per electric meter, connected to a smart meter only.
Prior utility approval
Not required
The utility may not require prior approval or charge fees. Exempt from interconnection agreements; exported generation is not compensated.
Smart meter and net metering
Conditions apply
A device may only be connected to a system using a smart meter, and a customer who already has a net-metering system may not also install a plug-in device.
If you rent
10 days' notice
The tenant gives the landlord 10 days' notice; the landlord has 10 days to respond with reasonable restrictions, and the tenant may proceed if there is no response.
Product standard
UL 3700 or equivalent
Complies with UL 3700 by UL Solutions or an equivalent NRTL, installed and operated per IEEE 1547-2018.

What is Vermont's power limit?

One or more devices per electric meter, with a maximum combined inverter capacity of not more than 1,200 W. A device may only be connected to a system that uses a smart meter.

Do you need to tell your utility?

The act does not require notification to the utility. The utility may not require approval before installation or use, or fees, and the device is exempt from 30 V.S.A. 248 and interconnection agreements. Two conditions apply: a device may only be connected to a system using a smart meter, and a customer who already has a net-metering system may not also install a plug-in device. Any electricity exported to the grid is not compensated.

What if you rent?

Vermont's law addresses tenants directly: a tenant gives the landlord 10 days' notice before installing a device. The landlord then has 10 days to respond with reasonable restrictions on the device; if the landlord does not respond within that period, the tenant may proceed.

What certification does Vermont require?

The device must comply with UL 3700 for plug-in photovoltaic systems by UL Solutions, or an equivalent certification by an equivalent nationally recognized testing laboratory, and be installed and operated in compliance with IEEE 1547-2018.

What UL 3700 covers →

How Vermont differs

Vermont is one of only two enacted laws here that name UL 3700 specifically, and one of the few that addresses renters: a tenant must give the landlord 10 days' notice. It requires no utility notification.

Compare plug-in solar rules by state

S.202; Act No. 149 (2026). Last checked August 28, 2026.

Also check landlord or HOA rules, local code, utility requirements outside this statute, and product instructions where relevant.